Showing posts with label winter. Show all posts
Showing posts with label winter. Show all posts

The Voodoo We Do

It's a passion. Yes, it's a job but it's a passion for most of us tending golf courses for a living. It creeps into your bloodstream and becomes part of your DNA. There are a multitude of factors that create this passion; going to work long before the rest of the world wakes up, seeing the sunrise everyday, orchestrating the daily production of course preparations, seeing the results of your plan play out in real time, the knowledge that your hard work will be enjoyed by many people, being tuned into the natural world, feeling the harshness and beauty of Mother Nature, growing high performance turfgrass, preparing a venue for sport competition, being part of an industry that fosters a special camaraderie, and the list goes on.

It doesn't matter that we are often the underdogs who never get the credit. It really doesn't matter because we revel in the grit. It's who we are. Often times golf course superintendents and their teams are asked to do more with less. It is to our downfall and the golfers benefit that we will never let the conditions slip in this scenario. It is in our make up that we will always go above and beyond to create incredible playing conditions and experiences no matter what obstacles are placed in our way.

Team  members working hard repairing winter-kill spots
The men and women that make up our teams are often subject to this passion. It rubs off on them and they are bitten by the "turf bug". Once bitten, the common goal of creating a great golfing experience becomes their passion as well. Some often go off to get an education in turfgrass science to further their career. We thank all of the hard working individuals that often times work on the course as a seasonal job trying to make ends meet. With a solid grounds crew team that shares the same goal and believes in the mission, the work becomes enjoyable. 

The spring of 2019 was a definite test of our fortitude. Coming off of an epic snowfall winter (with an undercoating of ice) and then into a very wet and cold extended spring made for some rough days. Both courses did suffer some turf injury. Stowe Country Club had various spots on multiple greens with winter-kill. The Mountain Course suffered three acres of fairway damage. The damage at The Mountain Course was the most I have seen in my fifteen years there. The attempts to grow these areas back with seed was difficult due to the cold and wet conditions. The Mountain Course sodded half of the area damaged on the fairways. This was made more difficult by the fact that all of the sod farms in New England and Quebec either ran out of creeping bentgrass sod or had low quality sod due to this same bad weather. Nonetheless, by the Kirkwood Invitational in late June at SCC and July 4th on the Mountain Course we were back to normal. 

Stowe Country Club
Changing cups during Stowe Balloon Fest
Last year brought some exciting news. Stowe Country Club has moved up the ranks in the rotation of Vermont tournaments. After two successful years (2017 and 2018) of  VTPGA stroke play championships and this year being the host of the VGA Senior Amateur, we were chosen to host the 2020 Vermont Amateur tournament. The grounds crew team and I are very proud to host this event and look forward to putting our passion to the test. Preparations to the course began this past fall and continue through the winter for this event that will be played in early July. We are dedicated to producing a championship venue that will make our members and ownership proud.

Cheers to a successful 2020 golf season and to the pledge that our passion will always run deep...

Winter work: Crucial for a successful golf season

A common question asked by golfers and non-golfers alike is, "What do you do in the winter?" This question used to annoy me, as I felt the person asking the question was being cynical or critical.  Over time I have come to realize that most people really have no idea what a golf course superintendent and team does in the summer, let alone in the winter. Now, when someone asks me what do we do in the winter, I take the time and explain this unique world of a golf course superintendent and greenkeeping.

Since our golf season in northern Vermont is relatively short -- from early May until late October -- proper preparation leading up to the beginning of the golf season is crucial. We take advantage of winter "down time" to "put the course to bed" properly in November and then spend the balance of the winter and early spring preparing for the intense six month golf season ahead. 

A look at the winter of 2017/18 provides a great example of the work we do.

Equipment
Our fleet of turf care equipment includes very specialized machines. The cost for one mower can run anywhere from $50,000 to $70,000. The replacement value of an average eighteen hole golf course equipment fleet can easily reach and exceed $1 million. Our goal in the winter is to look over each piece with a fine tooth comb and do all the preventive maintenance necessary to withstand six to eight months of constant use. Without this thorough winter maintenance the risk of a mid-season breakdown becomes much more likely. Avoiding a major mid-season repair is our goal.
Reels are ground and ready to go.
Grinders on the sides of photo. 

Quality of cut is of high importance to us. The majority of our mowing fleet are reel mowers. A reel mower is used because it can mow turf at low heights due to a cutting action like a scissor. A reel with multiple blades spins at high speeds while a stationary bedknife rides along the ground creating a cutting effect. Both reel blades and bedknives need to be precision ground at least once a year during the winter. This precision grinding is done on specialized grinding lathes in our shops. Think of this grinding process like the way skis and snowboards are ground. Sharp edges with proper angles are needed for the equipment to perform properly.

Brush Clearing and Tree Removal
Golf courses in New England are usually built within some type of forested setting. These forested settings, whether interior or exterior, want to grow. Without the occasional cutting back of the wood lines the forest will choke out the golf course.

Rocky hillside at SMC being cleared of brush.
At SMC, the team did great work cutting back the edges on hole seven, twelve, thirteen, and fourteen. A huge brush cutting project was also completed between hole sixteen and seventeen. This rocky hillside was cleared in 2004 to prepare for the construction of the course. Since then, all of the first growth species (cherry, birch, and poplar) vigorously grew back. This new look provides incredible views from sixteen tee and gives seventeen green a much better feel.

Cutting, clearing, and burning on fourth tee at SCC
At SCC, the team worked hard to cut back the edges on hole one and three. On the fourth hole the brush was cut back to the left of the teeing area. This cleared area will be the home of a new back tee. The October wind storm created multiple blow downs that needed to be cleaned up. The wooded area behind the fifth green was hit with six hemlocks that blew over due to the storm. After these areas were cleaned up, we continued with the tree removal program. Our efforts were focused on trees near greens and tees. The criteria for removing a tree has been laid out in a previous post SCC TREE REMOVAL PROGRAM . Most of the trees removed are white pine trees. These trees reduce the turf quality because of heavy shading, shallow roots, and copious amounts of tree litter. Along with better playing conditions the removal of white pines allows us to focus man-power on providing great conditions and not spending valuable time picking up pine needles, cones and branches. The added benefit is that previously obstructed mountain views are opened up.

Accessory Refurbishing
Production line of SMC tee markers
The winter months provide us the opportunity to take stock of all the accessories that are used on the golf course. Items like ball washers, bunker rakes, cart signs, and tee markers are refurbished to make look new again. This year it was determined that new tee markers were needed at both courses. In the spirit of good old fashion Yankee ingenuity and frugality we made them ourselves.

Painting SCC tee markers.
Notice the finished water cooler station in background.
At SMC, we made the markers out of white birch logs that came from the property. The logs were dried for several months, cut to size, spikes installed, and then the ends were painted. The natural look will fit in with our mountain golf course setting. At SCC, we used cedar posts cut into blocks for the tee marker. The cedar was stained, the sides painted with the appropriate color, and a spike was installed. Both teams did a great job paying close attention to detail and craftsmanship.

The other big in-house project at SCC was to build new water cooler stations. The old plastic stations were faded and simply had seen their day. These new stations were built by Mark Finch, SCC superintendent. Mark is a great woodworker and put his talents to work with these structures. This new look to the course will be striking.

One of six water cooler stations under construction.
Continuing Education
The "off" season provides us with the opportunity to attend conferences specific to turf and golf course management. At these events, the networking amongst fellow industry professionals and the educational classes are extremely valuable for our professional development. There are two premier conferences that are not to be missed. The Golf Industry Show put on by the Golf Course Superintendents Association of America is an incredible educational experience. This year it was held in San Antonio, TX and attended by 12,000 golf course industry professionals from all over the world. The trade show and educational opportunities are exceptional. The second conference is put on by the New England Regional Turfgrass Foundation and is annually held in Providence, RI. This conference and trade show provide a more regional educational experience.

With spring now upon us, we feel confident and ready for the new golf season ahead. It has been a busy few months at both courses. Our good work this winter will soon be available for all to enjoy as opening day is fast approaching. We hope you enjoy our winter work as much as we enjoy doing it. See you soon and have fun out there!

Ice Ice Baby

Laying down special covers before winter.
"Ice, Ice Baby" and I'm not referring to Vanilla Ice. The term "winter kill" usually refers to turf damage caused by ice formation on the playing surfaces. While there are other forms of winter kill (mainly snow mold fungus, crown hydration, and wind damage) the main cause of serious winter damage is ice. In previous posts I have discussed how ice damages turf. In short, the ice forms an impermeable layer that eventually suffocates the turf. Snow on the other hand allows the dormant turf to breath. Simply put, snow is good and ice is bad... Just like the current skiing conditions.

The black cover has melted the ice and is showing through
The agronomy team at Stowe Mountain Club and Stowe Country Club walk the courses multiple times in the winter to assess the snowpack and ice levels. We use this information to predict the spring conditions and properly prepare.  Due to the extreme weather fluctuations at Stowe Mountain Club we have instituted certain practices that mitigate the potential for ice injury. Specialized turf covers are placed on the greens in the fall that help prevent winter kill and then removed in the spring. These covers are used in areas that have historically received a significant amount of damage.  A common example of an unwanted ice formation on greens is caused by collar dams. A collar dam is created due to the turf height of the collar being higher than the height of the putting green. When snow melts, the change in height allows water to pool creating a natural dam blocking water from draining. When the temperatures fall below freezing the pooling water forms  unwanted ice along the perimeter of the green. To assist with the melting process, a section of the sod from the collar around greens is temporarily removed for the winter months and then repaired in the spring.   

Example of  a collar dam creating ice on a green
Proper spring thawing is a very critical step to the survival of turf that has been under ice.  A consistent thaw above freezing can aid in the turf's survival. Unlike the local maple industry, the extreme swings in temperature with severe freeze-thaw cycles are detrimental to the turf. During these cycles, the ice will begin to melt and create puddles on the turf. Then a drastic drop in night time temperatures to below freezing will flash freeze the water and kill the turf.

Notice the water that froze in the collar channel during melt
From mid December on, this winter has been all about the ice and these extreme weather conditions have captured our attention. Multiple icing events have occurred this winter. Some areas of Stowe Mountain Club have been under ice since December. Stowe Country Club has also seen it's share of ice. Rain and thaw events in January and February have only added to ice levels. Are we concerned? Yes. Have we done everything available to us to prevent ice? Yes. Have we seen ice damage before? Yes. Do we know how to recover from ice damage? Yes. Are we certain there will be damage in the spring? No. One never really knows what the outcome will be when the turf finally begins to wake up in the spring. We can only explain the current conditions, compare it to our historical knowledge, and prepare for what may happen. "Prepare for the worst and hope for the best" is a very appropriate saying for this winter's potential impact on our golf courses.

2017 In Review

Typical storm front this spring/early summer headed for Stowe!
The 2017 golf season did not disappoint with any lack of storyline. When reviewing a golf season in the northeast the weather will always be the main topic. The months of May, June and July brought copious amounts of rain. This period set records with rainfall amounts and most continuous days with rainfall. The total rainfall for this three month period was 25 inches. Compare that number to the annual average rainfall in Vermont of 36 inches and you realize the abnormality. While rain is not good for playing golf, working in it is equally not good. I applaud the agronomic teams for pushing through all those days working in the rain. It became the norm to put your raingear on when leaving the house in the early morning and still have it on arriving home from work. Let's just say Gore-Tex and rubber boots were your friend!

Moving into late summer we experienced some great weather. When fall arrived it was the complete opposite of the spring. The fall period set a new record for the most continuous days without rainfall. It was great golfing and working weather. While drainage systems were important in the spring, in the fall the irrigation system became a crucial tool for great conditions.

White pine blow down next to 12 green
As to not disappoint before year end, Mother Nature unleashed a powerful windstorm on October 31st that caused significant damage in Stowe and surrounding towns. Stowe Mountain Club received very little damage from the storm. At Stowe Country Club it was another story. Many mature pine trees were broken in half and uprooted. Multiple pines lost large limbs and there was a massive amounts of tree litter that fell everywhere. There is no doubt we will be cleaning up from this storm well into the spring of next year.  I've been working on golf courses for close to 30 years and Mother Nature continues to be the one true challenge year after year. There are some years when she plays nice but there are just as many when she lets everyone know who is in charge.

Mark Finch, SCC Superintendent, dormant seeding greens
Even with the wet start both Stowe Country Club and Stowe Mountain Club continued to improve the turf quality and overall playability of the golf courses. It is our goal to always improve and never settle for average. I have always believed in the saying that "good is the enemy of great" and the agronomic team operates in such a way. Each golf course continues to improve by adhering to solid agronomic practices. The ongoing effort to topdress and verticut greens on a regular basis is crucial to providing smooth putting surfaces. Proper aerification practices continue to firm up the playing surface by removing thatch. Turf health is maintained through the use of best available nutrition and pest control products. One agronomic focus that continues at Stowe Mountain Club and Stowe Country Club is the push to grow and promote our creeping bentgrass populations. Creeping bentgrass provides a great playing surface on the greens and fairways. At SMC it is a matter of maintaining the existing bentgrass while at SCC it is about promoting bentgrass. A new process was initiated at SCC this fall to promote bentgrass on the greens. After the course closed for the year the greens were aerated with an eight inch deep solid tine then core aerated with a traditional 3/8 inch hollow tine followed by a topdressing with sand. After this process was complete a specialized seeder planted a high quality creeping bentgrass seed. This type of seeding is referred to as "dormant" seeding. The process involves the seed overwintering as seed and then germinating in the spring when conditions become conducive to growth. This agronomic practice will increase the bentgrass populations on the greens at SCC leading to a better putting surface in the long term.

Sean Hanley laser grading 15 tee tops
At Stowe Country Club, there were multiple projects that occurred this year. The biggest was the renovation of the fifteenth tee complex. This area had been overrun with white pine trees and the teeing surface was mounded due to years of divot mix accumulation. While local and regional contractors were used on the job much of the work was done by the SCC team. Myself, Mark Finch, and crew members worked tirelessly to get this job done on time for the Kirkwood tournament. Much of the work was done in ankle deep mud during the pouring rain. This in-house work included irrigation/drainage installation, sodding, cart path preparation, and finish detail work. In-house construction projects are difficult because of the effort needed to simultaneously stay on top of the routine course maintenance work. We did also rely on the expertise of two regional golf course contractors. NMP Golf  Construction provided a shaper to do the major site work. A good "shaper" is the key to any successful golf construction job. These bulldozer operators have the eye for how a golf hole should look and play. Sean Hanley from On-Course Golf came in for the final laser grading of the tee surfaces. Sean is the contractor that built our upper driving range tee. This new tee and fourteenth green surround has received much praise from the players. As the area matures it will become an even better playing experience. Thanks to all involved in a great project.

Renovation of 15 bunker
Other projects at SCC included the renovation of the second and fifteenth bunkers, four bunkers in total. These projects were completed by the SCC crew. It has been a priority in recent years to renovate a few bunkers every year. The reason for these renovations include poor drainage, continued washout of bunker sand, and loss of contours due to time.  The renovation process involves establishing new outside contour lines, removing old sand, shaping out new bunker floor contours, installing drainage if needed, and  adding new sand that is specified for bunkers. Additional projects included a new cart path on the fifteenth hole that complemented the renovation of the tee and repairing the cart path around the practice green at the clubhouse. The clubhouse landscaping was renovated. Much of the landscaping lost all interest due to over grown lilac trees. Finally, the irrigation pond was dredged.

Spectacular course conditions at SMC
While SMC was not as active with projects, the season was defined by superb conditions. The agronomic team headed by assistant superintendent Zach Fleeger pushed for championship conditions on a daily basis. We heard great comments from the members and players all season. The winter brush cutting done by Zach and fellow assistant Jerry Elliott on the fourteenth and third hole were well received and gave these two holes a fresh new look and feel. Look for more of this great work during the upcoming winter.

As we move into the winter season there are some great projects we plan to accomplish that will continue to improve the golfing experience at both Stowe Mountain Club and Stowe Country Club. I will update the blog through the winter to discuss these projects. Be sure to enter your email on the blog homepage for up to date blog posts. Thanks to all who made the 2017 a successful year on the golf course. All the best to everyone during this holiday season. See you on the slopes or someplace warm playing some golf!








Winter Update

Turf Health
As winter fades away and spring arrives the agronomic team is always focused on how well the golf course turf has survived the harsh winter weather. You may be surprised to learn that this winter was one of the warmest on record. It is hard to believe because December was exceptionally snowy, and showed signs of a long winter ahead, but January ended up having little snowfall and warmer temperatures. February had some snowy weather but was also fairly mild. Now March has been frigid and snowy.

The early snow was good for the turf. Snow provides a layer of protection that allows the turf to breathe. The biggest obstacle to winter turf survival is ice formation. While snow allows for air exchange, the ice layer seals off any ability for the turf to breathe which smothers and kills the turf. There are many variables when it comes to winterkill but the biggest variable is  length of ice cover. The January weather did bring some rain and thaw creating ice. Stowe Country Club (SCC), being at a lower elevation, experienced greater thaws than Stowe Mountain Club (SMC). The eventual total loss of ice and snow due to these thaws has us believing winter damage at SCC will be minimal. SMC has had snow cover on most of the course since late November. The winter thaws produced some melt which created ice under the snow. This scenario provides a higher chance of damage. It is still too early to know with any certainty what we will look like in the spring. The creeping bentgrass varieties at SMC are tolerant of some ice cover. We will have a clearer picture at SMC as April arrives. To assist with survival the team will begin to remove snow from greens in the upcoming weeks. 

SMC Work
Hole 14 rock feature being exposed
Hole 14 brush pile ready to burn
This winter the team focused on two projects that will improve the playing experience. On the fourteenth hole underbrush to the left of the fairway landing area was cleared. There is a large outcropping of rock that was not exposed when the trees leafed out. Opening this area up will give the golfer a feel of width and provide a stunning visual of the beautiful rock formation. One of the goals is to expose and accentuate the natural features and great vistas that SMC golf course property provides. 

On the third hole, focus was placed on pushing back the tree line to the right of the teeing area. These trees and brush were growing in on the golf hole pushing the payers to the left and blocking sight lines to the right side of the fairway. With this area now clear, the player can see the whole fairway and have a visual on balls that land just of the fairway. The overall feeling on the third tee will be much less restrictive and provide a better experience. 

This hard work was conducted by assistant superintendents Zach Fleeger and Jerry Elliot. Winter brush and tree clearing is essential to the long term sustainability of the golfing experience at SMC. The golf course was built throughout a young forest and the perimeter continues to aggressively grow in on the course. Without this work our unique and breathtaking vistas will begin to disappear and the turf quality will suffer from shading and restricted air flow. Winter is the best time to conduct this work, but access is a real challenge. Zach and Jerry spent much of the winter hiking out to these areas pulling a sled full of logging gear. With a thermos full of coffee they would spend the day working hard cutting brush and felling trees, then burning what they cut. This is not easy work in the deep snow on a windy mountain golf course. The motivation for us to initiate this difficult work is knowing we are preserving the beauty of  Stowe Mountain Club golf course for our members and guests to enjoy.  

SCC Work
Olsen House locker room finished product
There was a big effort put forth this winter inside the Olsen house. The Olsen house is the single family house set within the maintenance facility compound. It was purchased fifteen years ago when it went up for sale for the purpose of protecting the future integrity of the golf maintenance compound. Without this property the maintenance operation is severely restricted. With the purchase of the house came the ability for the grounds crew to have running water, a bathroom, and a clean place for lunch. Prior to the house the crew ate lunch in the equipment repair shop that is attached to the red barn. While the addition of the house was a step forward, it is still an old house meant to be lived in. It was not set up to be a space for thirteen grown men to work out of. Our work is dirty. We spend long hours with machinery, maintaining turf, moving soil, cutting brush, etc. The set up of the house is far from ideal for these duties. To add to this, no major renovation has ever been done. To cover up the years of grime every square inch of wall space was painted, areas of floor that get heavy use were painted with grey industrial floor paint, and the upstairs carpet was removed and a laminate floor was installed. The work was done on a small budget and meant to be a quick, inexpensive way to make the space more efficient and demonstrate a professional work space. All of this work was done by our team and while it helped create a sense of pride, it is by no means a permanent solution.

Hole 1 Spruce tree removed (Notice die-back on top)
Hole 16 trees removed (Notice top die-back and thinning)
Great on-course work was also conducted this winter. When there was good snow cover, we ventured out on the course with our tractor that is outfitted with tire chains to continue the important tree removal program. The goal is to remove trees that are diseased or damaged, block vistas, create excessive man hours to clean up debris, negatively impact turf quality, or negatively impact shot quality and choice. This year we removed diseased trees on the first tee and sixteenth rough. Additionally, three large white pines were removed next to the 8th tee. On top of the issues described above, these trees were over gown and impeding any future renovation of the tee. Furthermore, they blocked a great vista of the Worcester Range ridge line from the third tee. 

Two significant projects are currently under way and are scheduled to be substantially complete by opening day. The irrigation pond was dredged to increase storage capacity. The pond had a significant amount of silt accumulation due to the feeder stream dumping sediments into it. The warm winter weather forced our initial plan to be amended. Initially, the sediment was to be hauled off the golf course via an ice road across the first fairway. The ice road is created by packing the snow then plowing it for a few weeks. With the mild winter there was no snow to create the road. When we did get snow, by the time the road was ready it melted due to a thaw. The amended plan was to remove the sediment and stockpile it in between the first and ninth hole. This area of un-mown turf had little aesthetic quality. The sediment will be allowed to dry, shaped out with a bulldozer, and seeded to a good quality seed mix.

The second project is focused on the fourteenth green and fifteenth tee area. This area has been struggling for years because of the row of white pine trees growing close to the green and tee. These trees were planted to provide a border to the Village Green condominiums. At this point in time the pines have grown to a size that they negatively impact the golf course. The only option was their removal. With the pine trees gone, the fifteenth tee can be renovated. The turf on the tee has always struggled due to the close proximity of the trees. In addition, the tee suffers from mounding. This mounding is common in old par three tees because of years of divot mix building up in the middle of the tee. The new tee will have a sand based rootzone and be professionally leveled to provide an exceptional playing experience. The area behind the fourteenth green that was populated by the trees will be filled with dirt and a rolling mound will be installed. Fescue grass will be seeded on the mounds providing a great visual from the approach shot. While the new open look will be different it is the best decision for the long term enjoyment of these two golf holes.

With snow still on the ground, we are preparing for the first window of opportunity to complete these projects at both SMC and SCC. The entire agronomic team looks forward to presenting the final products to the players when the golf season arrives.

2016 Fall Recap

Wow! December has brought above average snowfall for Mount Mansfield this year. The skiing and riding is off to a great start. There are smiles all over the mountain. While the snow has everyone excited for early season fun on the slopes, it is a good time to take a look back at the 2016 golfing season and the activity of the grounds staff.

2016 Headline

The headline story for golf course conditions in Vermont and all of New England was the drought. Many golf courses suffered through the last part of the golf season with diminished to depleted irrigation water supplies. This lead to some turf loss due to extreme drought stress. Stowe Mountain Club (SMC) fared well with the drought. Our water supply comes from Peregrine Lake. Peregrine lake was designed for snow making reserves and holds 111 million gallons of water. For comparison, the golf course will only use 10 million on a very dry year. Coupled with a substantial reserve of water, the irrigation system was designed to cover all playing surfaces from the cart path to the edge of the fescue grass. While Stowe Mountain Club is in a good position to handle drought conditions, the situation at Stowe Country Club (SCC) is much different.

SCC Pond Drained and Ready For Winter Dredging
The pond on the ninth hole is the irrigation water source at SCC. This pond has a holding capacity of 1 million gallons. This size pond is a very small storage capacity for a golf course. What makes the pond usable is the fact that it is fed by a stream that enters the property from the first hole. The issue that occurs in the late summer is that the stream dries up and the pond cannot be recharged. This year we began rationing water in late August and continued through the dry September with minimal capacity to irrigate. Thanks to the hard work of Mark Finch and Matt Jung we hung on during these difficult times and the conditions did not suffer greatly. We did have to suspend the washing of equipment in mid-September because the equipment wash pad is fed by irrigation water. This became an operational challenge but we decided it was necessary to conserve the little water that was left in the pond for turf health.  

Strides are being made to eliminate this unfavorable scenario in the future. One very important water conservation tool installed this summer was the replacement of the old irrigation controllers (See prior blog post). The new controllers with centralized control allowed for precise programing of nightly irrigation cycles. This new system ensures very little waste in irrigation water and reduces the overall electrical consumption of the pump station. This winter we will be dredging the pond to regain water storage capacity. The stream that feeds the pond carries sediment that overtime has filled in the pond. The contractor will do this work in late winter to minimize the damage to the golf course. Lastly, we are designing a pumping system that will utilize the water from the West Branch of the Little River that runs along the fourteenth hole. This secondary water source will fill the irrigation pond when the feeder stream dries up. The pumping capacity of this pump is low enough to have no impact on the health of the river. These investments will assist us with providing great golf course conditions while using the latest technologies to conserve and use the water wisely.

Fall Projects

The fall is a great time to do small construction projects on the golf course. By this time of year  the grass has slowed so that mowing frequency has been reduced which frees up labor to be allocated to such projects. The bonus period for construction on the course occurs in November. By this time, the courses have closed and we have completed most of the winterization projects that are crucial for turf survival. November can be hit and miss when it comes to favorable working weather. This year the November weather gave us a small window to be productive on the golf courses.

SMC Hole 7 Curb Removal
13 Bunker Before
The difference in elevation between the two golf courses was very evident this fall. The weather turned cold and snowy much sooner at SMC than at SCC. As an early winter was setting in at SMC a project we were able to complete was the removal of the curb at the seventh tee. The curb was originally installed to manage cart traffic in order to minimize excessive wear to the turf. As time progressed it became clear that this curb was impacting play in a negative way. The ball from a long left tee shot on the sixth hole would end up catching this curb and rolling all the way to the eighth hole. While an errant shot should not be rewarded, a player should have the opportunity to find the ball and attempt a recovery shot. By removing the curb, a ball will now simply roll off the path onto the seventh tee surrounds providing a player with a manageable recovery opportunity.

13 Bunker During
With the weather window staying open for longer at SCC we initiated three projects. A drain line was installed at the practice facility to alleviate various standing water issues. This drainage project fixed a wet area near the closet target green from the upper tee. On this same pipe we connected a line that will capture water from Sinclair Road that would puddle near the newly paved parking lot. This was not a glamorous project but it was necessary to continue to improve our great practice facility. A second drainage project occurred at the fifth hole approach. A chronic wet area existed below the right green-side bunker. A drain line was installed to dry this area and various drainage laterals were installed to provide additional drainage in the approach. The final project was to repair the right side bunker at the thirteenth green. This bunker was one of the bunkers that puddled for a long period after a rain storm. Additionally, the size of the bunker had shrunk over time. To repair this bunker we installed a center drain line, expanded the contour lines, and added better performing bunker sand. This bunker repair is the continuation of our overall goal to provide great playing surfaces continuously across the entire golf course in all weather conditions.

13 Bunker Final
We look forward to presenting these improvements to the players this spring. Until then, enjoy this good old fashion winter weather!


Winter Reflection at Stowe Mountain Club

While snow depths stayed low all winter season, the grounds department was able to prepare and complete some great projects on the golf course. It also halted the stress of true turf management, allowing our team to continue exploring opportunities to improve your golfing experience. Arguably, the winter months are some of the most important months for a golf course maintenance team. On the surface, it may seem like our main priority is only snow removal, but our scope of work extends far beyond. Refining the maintenance operation, analyzing the budget, and most importantly researching our team output on the property allows us to prepare for another successful golf season.
2 tee underbrush
Obstructed view on 18

This particular winter season, we identified 2 particular projects. Tees on holes 2 and 18 needed a facelift. Our goal was to improve turf health and aesthetic value. Like any project on the golf course, there is necessary research that needs to be completed before the start. On top of analyzing the budget, we make sure that the project will benefit the health of the surrounding turf. Most of the time the aesthetic value will also be immediately enhanced, but sometimes it may take a few weeks to a few months for the surrounding turf condition to also improve. As you'll be able to see during your round, our work significantly improves the aesthetic value of the holes. Over time, this work will also improve the health of the surrounding turf. The work on 2 tee opens up views to Peregrine Lake and the work on 18 opens up a view of "The Chin" on Mt. Mansfield and a beautiful rock face. The brush cleared on 18 tee also improves the playability from the black/blue tees (playing a right to left shot).
Cleared view of the "chin"on 18
Cutting brush under 2 tee
Clearing underbrush this winter, particularly from tee surrounds, was an on-course priority. As I mentioned before, this particular act can help health and aesthetic value. By clearing brush, this will
dynamically enhance air flow and circulation. By enhancing these two things, the turf will have more sunlight and oxygen improving its ability to make more food for itself. Organically, the turf plant will also be able to improve its natural defenses, potentially decreasing overall pesticide usage.

Burning brush
We were then able to discard the removed brush by naturally burning. However, you will notice some standing "dead" trees remaining in the cleared areas. We refer to these "dead" trees as"snags." The "snags" are necessary in providing habitat for wildlife such as woodpeckers. The "snags" allow the woodpeckers to create cavities. These cavities allow smaller birds to occupy these spaces to nest called "cavity nesting." During this whole process we were able to partner with the Mountain Operation Team and borrow a tracked vehicle to access the golf course during the winter months. The sharing of assets between resort departments is really proving to be a valuable process for everyone involved. Sharing assets primarily helps the bottom line when analyzing the necessary inputs needed for these capital projects. This on-course winter work is very important because the forest will continue to grow in on the golf course, negatively impacting playability and aesthetic value.
A look at the final product
Thank you for your continued support! We look forward to your feedback regarding these winter projects!

Winter Work at Stowe Country Club

By Mark Finch, SCC Golf Course Superintendent

Winter Work

When we see a golfer or two walking the course course with a couple of irons and a pocket full of golf balls around Thanksgiving, it is a telling sign that winter in coming late. When we see the same people roaming the snow-less property on Christmas Eve is in confirmation that winter is late. Then to see people hitting balls and carrying a shag bag around the practice field after the New Year, we become skeptical of winter's arrival. 

So how does a winter like this affect the golf course in the spring? A quick recap of notable events:
  • 66 degrees, December 24th
  • 1 inch rain, December 30-31st
  • (-10) degrees, January 5th
  • 1 inch rain, January 10th
  • 3 degrees, January 11th
  • 54 degrees, February 3rd
  • (-18) degrees, February 14th
  • 1 inch rain, February 16th
  • 5 degrees, February 18th
  • 0.75 inches rain, February 20th 
Ice formation on the turf is the conditions we are most concerned about in our region as it pertains to the winter turf survival. The other condition is called crown hydration. This is the harmful freeze-thaw pattern that the turf is susceptible to while breaking dormancy in mid-March and early-April. These fluctuating extremes are notable but not that unusual. The sequence in which these events take place is what requires close attention. Basically, the recipe for disaster (in our case, ice formation) is a winter rain event immediately followed by single-digit temperatures. We observed this pattern three times so far this season. Fortunately, in the case of the December rain, the ground had not yet frozen so the rain was absorbed throughout the soil. The subsequent events occurred in mid-January/February and there was a large amount of ice. From a glass half full perspective we had a couple factors on our side at that point; barely any snow and it was already mid-February. Turf can withstand a certain amount of time under ice cover. Creeping bentgrass has an ice tolerance of 90 days and Poa Annua has a tolerance of only 30-60 days. Having a mixed stand of both of these grasses at SCC causes concern for any length of ice cover. This February icing events puts us in the better scenario for survival due to the shorter duration under ice. Turf damage occurs from ice coverage due to the low levels of oxygen and the accumulation of exhausted gasses that can be fatal to turfgrass. 

It is almost inevitable that every winter comes with a January (or February) thaw. As noted, on February third we reached fifty four degrees which typically would have melted a lot of snow. But with hardly any snow on the golf course to melt, it was the ice that was melting. By the end of that week Stowe Country Club was approximately ninety percent void of ice and snow. 

Digging Dry Well On 18 Green
We are not in the clear yet. The scariest days of winter are still to come for golf course superintendents in northern climates. The days and nights of freeze-thaw, or crown hydration potential, occur in mid-March through early-April. Essentially, the plant may begin to take on water during a thaw and then freeze at night. The cell structure of the plant becomes swollen with water and when this water freezes the cells expand to the point of rupturing. This rupture occurs in the crown, or growing point, of the grass so the plant becomes injured. 

We do everything we can throughout the winter as superintendents to intervene and mitigate any conditions that may be conducive to either of these types of winter associated injuries. Timely snow removal to hasten ice melt, drainage improvements to facilitate standing water and plant protectant applications are some examples of countermeasures we routinely execute before winter arrives and as the snow melts. Invariably, there is always the possibility of some amount of turf loss due to the unfavorable winter conditions. As for this year, we are closing in on the point where we can rule out much possibility of significant ice damage due to length of cover.

Adding New Sand at 18 Bunker
Our staff took full advantage of the extended period of mild weather that occurred well into the month of December. This "bonus" time was used to aerate fairways and rough along with facilitate a few drainage projects and bunker improvements that were scheduled to take place in spring 2016. Golf course improvements and repair that began after the golf course closed for the season include:
  • Both greenside bunkers renovated on hole 18 (completed reshaping, new sand and internal drainage)
  • Fairway/Rough internal drainage on hole 13 (piping and surface drains installed and ready for spring regrassing) 
  • Leveling and resodding of back tee on hole 10
There is no question that drainage infrastructure is lacking at SCC but our progress is reaching a  point where noticeable improvement is being made. We plan to continue addressing poorly draining ares of the golf course in the early spring and again in the fall of 2016. Our efforts are focused on fairways and bunkers. Enhancements in our cultural programs on greens has paid great dividends with the drainage performance and playability of the putting surfaces. We will continue to institute new practices to sustain the progression this year. 
Repairing Drainage 18 Bunker

During the month of January we resumed implementing our tree management program. For a period of time we had just enough snow to get on on the course with our tractor to conduct tree work. There are a growing number of tree specimens on our property that are diseased and hazardous. We specifically identified an area between the twelfth and thirteenth holes where spruce trees had matured to the point of die-back and became diseased. The selective removal of these trees will better enable us to safely recapture the beauty in this vast rolling space as a fescue area with desirable trees featured. A similar renovation took place between the fourth and fifth holes. The species here were northern white pines of the "pasture" form. After assessing the unnerving growth habits and health of this stand we prioritized reclaiming this tract as well. The completion of work at this location will introduce expansive views of the golf course as well as the scenic view of Camel's Hump from the fourth tee and green. We are excited to be finalizing the revitalization of the fourth hole through the completion of several projects over the past few years. These efforts include: 
  • Tree removal and fescue grass establishment, left side 2013-14
  • Tree removal and fescue seeding right side 2014-15
  • Cart path relocated and paved, tee to green, 2015
  • Mounded fescue features, right side, 2015
  • Bunker shape restoration, new sand, 2015
  • Tree removal, fescue restoration, right side, 2015-16
Golf Maintenance Staff Re-assembling SMC Tent
At this point in February we feel the golf season fast approaching and there is still a lot to do. There are golf course accessories to refurbish for another season and a fleet of grounds equipment that we overhaul, service and sharpen to be ready for heavy use during the golf season. We are fortunate enough to house all of our equipment under shelter this year for the first time ever with the addition of a temporary structure that we re-purposed from Stowe Mountain Club. We were able to erect the structure ourselves just in time before the first snow. 

When the golf ends for the year our efforts to maintain the course do not end. In fact, some of our most productive work is conducted in the off season. With another winter flying by, we continue to work hard preparing for another great golf season at Stowe Country Club.
 

The Fall Push

The golf season may have ended at the resort but the work on the golf course continues. Both golf maintenance crews are busy with chores to put the courses to bed for the winter. The challenge this time of year is the unpredictable weather and not knowing when winter conditions will finally arrive.  Our goal is to have all winterization chores done by the second week of November.
Draining spring on  11 approach

When the courses close our first task is to bring in all items on the course that are not anchored to the ground. These items include tee markers, flags, benches, hazard markers, bunker rakes, ball washers, etc. These items are thoroughly cleaned and stored safely for the winter. Tree litter clean up is constant in these last few weeks. Whenever conditions allow we will clean up leaves and pine needles. The irrigation systems will be cleared of water using compressed air. Close attention is paid to this chore because an improperly blown out system will lead to broken pipes or irrigation heads in the spring. After the system is clear of water the pumps are dismantled for the winter.     

Old picture of SCC showing original bunker contour lines on 18
This time period on the golf course is ideal for drainage projects. Multiple drainage projects have already been accomplished and are still under way. At Stowe Mountain Club (SMC), three springs that popped up during the very wet June were fixed. Due to the mountainous terrain, springs will pop up over time as the groundwater moves through the underlying soil and exits at the surface. These spring diversion projects were done on eleven approach, sixteen approach, and eighteen white tee. A large drainage project was also completed between seven tee and 8 fairway. Due to the proximity to the dam, this project was contracted out and was supervised by an engineer. We will be sodding this area in the coming days so that it will be ready for play on opening day next year.
Same bunker today at SCC. Notice how bunker has grown in.

At Stowe Country Club (SCC), we are close to completing the bunker restoration on the eighteenth green. These bunkers had grown in over time and water would puddle in the bunkers after rain event. These bunkers were re-contoured to the original shape, drainage was installed, and new sand was added.
SMC, Applying Wintergreen to greens 

Finally, in preparation for the long winter we implement multiple preemptive measures to help the turfgrass survive.  If you ski during the early season you may notice that the greens at SMC are a vibrant green color. This is due to a paint that is applied to the putting surface for winter protection. This product is called Wintergreen and is a combination of a latex paint and anti-transpirant. The logic behind this application is that it protects the turf from severe wind damage, will prevent disease controls from degrading, and will help the soil warm up in the Spring due to the dark green color. After painting the greens we will lay a protective mat in areas that experienced prior winter damage. This mat is called Enkamat and has proven to prevent ice damage. We will then cover the entire green with a breathable cover on eight of the greens. These greens are covered because they get windblown and do not get the protective snow cover. Some of the same measures are implemented at SCC, but not all.

If you get a chance to enjoy touring the course this winter please stay off of the greens. Packing the snow on the green will cause icing which can kill turfgrass. We will rope off all the greens to identify the location of each green. Both golf maintenance teams hope you had an enjoyable 2015 golf season. We are already preparing for another great golf season in 2016.


The Spring Hustle


   As May has come to a close, it is a good time to review the condition of the golf courses and discuss the projects that have occurred. The variability of the Vermont spring is always a challenge for golf course maintenance. While planning operations is essential, it is even more important to be able to react quickly to unexpected challenges.

    The biggest challenge this spring has been the dry weather. While recent rains have helped, early spring rain did not occur. The successful start up and operation of  both irrigation systems has been of extreme importance. As the turf completes its winter dormancy and begins to grow, the need for water is crucial to initiate growth. While it might be hard to believe, early irrigation in May is crucial for positive turf growth. Turf is grown in sand based systems that can lose moisture quickly. In addition, the closely mown turf is very susceptible to moisture loss. Compounding the challenge of irrigating in a dry spring, a deep frost layer caused an above average number of breaks in the irrigation system piping. The turf care teams have been hustling to repair these breaks so that irrigation can continue.

9th green at Stowe Country Club. Notice standing water in the
damaged areas.
    Stowe Mountain Club (SMC) and Stowe Country Club (SCC) courses were impacted by winterkill this spring. The two reasons for winterkill this year were crown hydration and wind desiccation.  Stowe Mountain Club received desiccation damage on the first tee and sixth green. Those two areas were impacted due to the exposure to the severe north winds in the winter. In my eleven years at Stowe Mountain Club, I have never seen these levels of wind desiccation damage. The damage occurs due to the severe winds simply drying out the above ground tissue of the turf. Most often the turf can withstand the winter winds, this year the extended cold weather coupled with high winds pushed the turf to the extreme limit.

    This spring both courses were impacted by crown hydration. Ideal turf growing conditions during spring thaw requires sufficient surface drainage preventing standing water. Crown hydration occurs when night time temperatures drop below freezing. The cells in the turf plant will explode due to the freezing standing water. The common theme with this type of damage occurs in chronic wet areas. Stowe Country Club experienced crown hydration on the greens of one, nine, thirteen, and eighteen. At Stowe Mountain Club the damage occurred in the low lying areas of the fairways. The worst of the damage at SMC was found on eight and twelve. The turf care teams have seeded the damaged areas and positive germination has occurred. Full coverage is expected by the end of June. In reviewing the best options for damage prevention in the future, the installation of sub surface drainage to these wet areas will significantly reduce the potential for crown hydration.

    Currently, the Stowe Mountain Club crew is wrapping up a couple drainage projects that were initiated in the late Fall of 2014. The hillside on the eleventh hole had drainage installed to firm up the slope due to springs emerging through the turf. These springs were captured and piped through the fairway. The fourteenth fairway had drainage installed to help prevent winter damage and help firm up the fairway after rain events. These projects are in the final stages of completion.

    At Stowe Country Club a large key culvert was replaced in the practice field. The old pipe was made of metal and was rusted out creating multiple sinkholes holes in the field. Coupled with this project is the addition of target greens in the practice field. When completed there will be four greens for players to hit at. These greens will replace the current poles. The design of these target greens is such that they are raised slightly above the field and the top surface will be mowed at a short height. This raised angle and low cut will provide a larger target for players to aim at and improve their game. Two of the four greens have been shaped and seeded. the other two are still under construction. As an added visual aesthetic, there will be pseudo bunkers placed in front of these greens. These features will look like bunkers but will be built in such a manner that mowing and picking balls will not be extra maintenance.

Wash pad at Stowe Country Club. Notice grass clipping
separation system in trough.
    Finally, a project was completed at the SCC maintenance facility that has revolutionized how the turf care team  conducts business on a daily basis. A new equipment wash pad was constructed away from the fourteenth tee box. Prior to this new wash area, all equipment was washed directly adjacent to the tee box. The subsequent activity and smell of decaying grass clipping significantly impacted the golfing experience. The new location is on the other side of the road out of site of the public and golfers. The construction of the wash area is such that grass clippings can be managed properly reducing the odor and the water runoff is treated using a natural buffering system. Maintaining great golfing conditions starts with effective, efficient, and safe working conditions at the maintenance facility.

    While the dry May weather has presented some challenges for the grounds staff, the dry firm conditions have been excellent for golf. I hope everyone has had the opportunity to get out and play. Our two golf courses are very close to rebounding from winter and will soon be in top form. Thank you for your patience and assistance while we continue to maintain and improve the golfing experience at Stowe Mountain Resort.