The Voodoo We Do

It's a passion. Yes, it's a job but it's a passion for most of us tending golf courses for a living. It creeps into your bloodstream and becomes part of your DNA. There are a multitude of factors that create this passion; going to work long before the rest of the world wakes up, seeing the sunrise everyday, orchestrating the daily production of course preparations, seeing the results of your plan play out in real time, the knowledge that your hard work will be enjoyed by many people, being tuned into the natural world, feeling the harshness and beauty of Mother Nature, growing high performance turfgrass, preparing a venue for sport competition, being part of an industry that fosters a special camaraderie, and the list goes on.

It doesn't matter that we are often the underdogs who never get the credit. It really doesn't matter because we revel in the grit. It's who we are. Often times golf course superintendents and their teams are asked to do more with less. It is to our downfall and the golfers benefit that we will never let the conditions slip in this scenario. It is in our make up that we will always go above and beyond to create incredible playing conditions and experiences no matter what obstacles are placed in our way.

Team  members working hard repairing winter-kill spots
The men and women that make up our teams are often subject to this passion. It rubs off on them and they are bitten by the "turf bug". Once bitten, the common goal of creating a great golfing experience becomes their passion as well. Some often go off to get an education in turfgrass science to further their career. We thank all of the hard working individuals that often times work on the course as a seasonal job trying to make ends meet. With a solid grounds crew team that shares the same goal and believes in the mission, the work becomes enjoyable. 

The spring of 2019 was a definite test of our fortitude. Coming off of an epic snowfall winter (with an undercoating of ice) and then into a very wet and cold extended spring made for some rough days. Both courses did suffer some turf injury. Stowe Country Club had various spots on multiple greens with winter-kill. The Mountain Course suffered three acres of fairway damage. The damage at The Mountain Course was the most I have seen in my fifteen years there. The attempts to grow these areas back with seed was difficult due to the cold and wet conditions. The Mountain Course sodded half of the area damaged on the fairways. This was made more difficult by the fact that all of the sod farms in New England and Quebec either ran out of creeping bentgrass sod or had low quality sod due to this same bad weather. Nonetheless, by the Kirkwood Invitational in late June at SCC and July 4th on the Mountain Course we were back to normal. 

Stowe Country Club
Changing cups during Stowe Balloon Fest
Last year brought some exciting news. Stowe Country Club has moved up the ranks in the rotation of Vermont tournaments. After two successful years (2017 and 2018) of  VTPGA stroke play championships and this year being the host of the VGA Senior Amateur, we were chosen to host the 2020 Vermont Amateur tournament. The grounds crew team and I are very proud to host this event and look forward to putting our passion to the test. Preparations to the course began this past fall and continue through the winter for this event that will be played in early July. We are dedicated to producing a championship venue that will make our members and ownership proud.

Cheers to a successful 2020 golf season and to the pledge that our passion will always run deep...

2017 In Review

Typical storm front this spring/early summer headed for Stowe!
The 2017 golf season did not disappoint with any lack of storyline. When reviewing a golf season in the northeast the weather will always be the main topic. The months of May, June and July brought copious amounts of rain. This period set records with rainfall amounts and most continuous days with rainfall. The total rainfall for this three month period was 25 inches. Compare that number to the annual average rainfall in Vermont of 36 inches and you realize the abnormality. While rain is not good for playing golf, working in it is equally not good. I applaud the agronomic teams for pushing through all those days working in the rain. It became the norm to put your raingear on when leaving the house in the early morning and still have it on arriving home from work. Let's just say Gore-Tex and rubber boots were your friend!

Moving into late summer we experienced some great weather. When fall arrived it was the complete opposite of the spring. The fall period set a new record for the most continuous days without rainfall. It was great golfing and working weather. While drainage systems were important in the spring, in the fall the irrigation system became a crucial tool for great conditions.

White pine blow down next to 12 green
As to not disappoint before year end, Mother Nature unleashed a powerful windstorm on October 31st that caused significant damage in Stowe and surrounding towns. Stowe Mountain Club received very little damage from the storm. At Stowe Country Club it was another story. Many mature pine trees were broken in half and uprooted. Multiple pines lost large limbs and there was a massive amounts of tree litter that fell everywhere. There is no doubt we will be cleaning up from this storm well into the spring of next year.  I've been working on golf courses for close to 30 years and Mother Nature continues to be the one true challenge year after year. There are some years when she plays nice but there are just as many when she lets everyone know who is in charge.

Mark Finch, SCC Superintendent, dormant seeding greens
Even with the wet start both Stowe Country Club and Stowe Mountain Club continued to improve the turf quality and overall playability of the golf courses. It is our goal to always improve and never settle for average. I have always believed in the saying that "good is the enemy of great" and the agronomic team operates in such a way. Each golf course continues to improve by adhering to solid agronomic practices. The ongoing effort to topdress and verticut greens on a regular basis is crucial to providing smooth putting surfaces. Proper aerification practices continue to firm up the playing surface by removing thatch. Turf health is maintained through the use of best available nutrition and pest control products. One agronomic focus that continues at Stowe Mountain Club and Stowe Country Club is the push to grow and promote our creeping bentgrass populations. Creeping bentgrass provides a great playing surface on the greens and fairways. At SMC it is a matter of maintaining the existing bentgrass while at SCC it is about promoting bentgrass. A new process was initiated at SCC this fall to promote bentgrass on the greens. After the course closed for the year the greens were aerated with an eight inch deep solid tine then core aerated with a traditional 3/8 inch hollow tine followed by a topdressing with sand. After this process was complete a specialized seeder planted a high quality creeping bentgrass seed. This type of seeding is referred to as "dormant" seeding. The process involves the seed overwintering as seed and then germinating in the spring when conditions become conducive to growth. This agronomic practice will increase the bentgrass populations on the greens at SCC leading to a better putting surface in the long term.

Sean Hanley laser grading 15 tee tops
At Stowe Country Club, there were multiple projects that occurred this year. The biggest was the renovation of the fifteenth tee complex. This area had been overrun with white pine trees and the teeing surface was mounded due to years of divot mix accumulation. While local and regional contractors were used on the job much of the work was done by the SCC team. Myself, Mark Finch, and crew members worked tirelessly to get this job done on time for the Kirkwood tournament. Much of the work was done in ankle deep mud during the pouring rain. This in-house work included irrigation/drainage installation, sodding, cart path preparation, and finish detail work. In-house construction projects are difficult because of the effort needed to simultaneously stay on top of the routine course maintenance work. We did also rely on the expertise of two regional golf course contractors. NMP Golf  Construction provided a shaper to do the major site work. A good "shaper" is the key to any successful golf construction job. These bulldozer operators have the eye for how a golf hole should look and play. Sean Hanley from On-Course Golf came in for the final laser grading of the tee surfaces. Sean is the contractor that built our upper driving range tee. This new tee and fourteenth green surround has received much praise from the players. As the area matures it will become an even better playing experience. Thanks to all involved in a great project.

Renovation of 15 bunker
Other projects at SCC included the renovation of the second and fifteenth bunkers, four bunkers in total. These projects were completed by the SCC crew. It has been a priority in recent years to renovate a few bunkers every year. The reason for these renovations include poor drainage, continued washout of bunker sand, and loss of contours due to time.  The renovation process involves establishing new outside contour lines, removing old sand, shaping out new bunker floor contours, installing drainage if needed, and  adding new sand that is specified for bunkers. Additional projects included a new cart path on the fifteenth hole that complemented the renovation of the tee and repairing the cart path around the practice green at the clubhouse. The clubhouse landscaping was renovated. Much of the landscaping lost all interest due to over grown lilac trees. Finally, the irrigation pond was dredged.

Spectacular course conditions at SMC
While SMC was not as active with projects, the season was defined by superb conditions. The agronomic team headed by assistant superintendent Zach Fleeger pushed for championship conditions on a daily basis. We heard great comments from the members and players all season. The winter brush cutting done by Zach and fellow assistant Jerry Elliott on the fourteenth and third hole were well received and gave these two holes a fresh new look and feel. Look for more of this great work during the upcoming winter.

As we move into the winter season there are some great projects we plan to accomplish that will continue to improve the golfing experience at both Stowe Mountain Club and Stowe Country Club. I will update the blog through the winter to discuss these projects. Be sure to enter your email on the blog homepage for up to date blog posts. Thanks to all who made the 2017 a successful year on the golf course. All the best to everyone during this holiday season. See you on the slopes or someplace warm playing some golf!








Pure Stands

Maintaining pure stands of desirable turfgrass on our golf courses is the ultimate agronomic goal. The desirable grass on greens and fairways is creeping bentgrass.  On tees at Stowe Country Club (SCC) the desirable grass is creeping bentgrass. At Stowe Mountain Club (SMC), the tees are a mixture of Kentucky bluegrass and fine fescue. The rough at both golf courses is also the mixture of Kentucky bluegrass and fine fescue. Finally, the desirable grass in the no-mow high grass areas that sit on the edge of golf holes is a blend of fine fescues. At SCC, while creeping bentgrass is most desirable, the fine fescues are considered desirable in all playing surfaces except greens.


The purpose of this goal is based on playability. When multiple different grasses or weeds populate a playing surface ball roll and shot making are both negatively impacted.  On greens, pure stands of creeping bentgrass is desirable because it will provide the smoothest ball roll. The creeping nature of the bentgrasses allows for the ability to mow at low heights of cut. The non desirable grass that we manage against is Poa annua or annual bluegrass. Poa annua is present in the greens at SCC but not at SMC. In the spring, the Poa annua will produce a seedhead which in turn makes for a very bumpy and irregular putting surface. Additionally, Poa annua is not as tolerant to stresses as bentgrass is and will decline in the summer and winter if conditions become severe.

On tees, the two golf courses differ in the desirable grasses but the purity of the turf is still important. Weeds such as crabgrass are kept at bay because of its coarse leaves that produce an uneven surface. Poa annua is considered a weed on both sets of tees because of it's clumpy growth habit. The interesting aspect of our tees is that while creeping bentgrass is the desirable grass at SCC it is considered a non-desirable grass at SMC. The bluegrass/fescue mixture was chosen for tees at SMC due to it's low maintenance costs and durability. Creeping bentgrass has invaded the teeing surface and is now considered a weed on tee surfaces. The bentgrass got into the tees during construction. The bentgrass seed is very small and subsequently was tracked onto the tees from the shoes of the construction workers and was in poorly cleaned drop seeders. As time progressed this aggressive grass has spread. Removal of this grass is needed because the blotchy nature of the bentgrass patches can be distracting to the eye and the feel underfoot is completely different from the bluegrass/fescue mix. Additionally, the agronomic requirements for bentgrass is different than bluegrass/fescue making proper management a challenge.

Pure Creeping Bentgrass #7 Fairway at SMC
On fairways, creeping bentgrass is the best possible playing surface. Kept weed and Poa annua free, a pure bentgrass fairway provides the best possible shot making experience.

In the rough areas, bluegrass/fescue mixtures are the most desirable grass stand because of the upright growth habit. This growth habit props the ball up providing a good lie. Broadleaf and crabgrass weeds can present a problem if the populations are too high causing difficult lies.  As with the tees at SMC, creeping bentgrass is considered a weed in rough areas at both golf courses. The reason for this is that when bentgrass is mowed at rough height of two and a half inches, the bentgrass becomes very puffy. Playing out of a bentgrass rough is difficult because the golf ball settles deep into the puffy bentgrass and the grass will grab the golf club causing errant shots.

In the no-mow areas the fescue grasses are the desirable stand of grass. The fescues have a growth habit that allows for the golf ball to be found and advanced even when the grass is left to grow high and seed out. These fescue areas provide a look to the golf course that is very aesthetically pleasing, especially when the grass turns brown. Weeds and pasture grasses must be kept out of these areas because finding and hitting a ball out of non-pure stands of fescue is very difficult resulting in errant shots and slow play.

The strategy to accomplish the goal of pure stands is varied. When it comes to growing pure creeping bentgrass there are some basic rules. The timing of aerification is very important. Both SCC and SMC greens were both recently aerated because late August and early September is the best time for this. The reason for this is that Poa annua will not germinate when the soil temperatures are warm. Aerating in April and October is avoided due to the cool soil temps and the possibility of increasing the Poa annua populations when the putting surface is opened up due to aeration. The aeration is necessary to maintain proper organic matter and thatch levels. When bentgrass gets too thatchy it can begin to thin and weeds will encroach into the stand. Specific growth regulators are used to promote bentgrass growth and discourage Poa annua growth.

Creeping Bentgrass Turning White On #12 Tees at SMC
Maintaining pure stands of Kentucky bluegrass/fescue is accomplished through the used of different herbicides. The broadleaved and crabgrass weeds can be easily controlled on an annual basis. The more difficult "weed" is creeping bentgrass. The same characteristics that make bentgrass a desirable grass in some areas is the same reason why it is difficult to remove from bluegrass/fescue stands. The aggressive and resilient characteristics of the bentgrass calls for multiple herbicide applications to remove this grass. Currently, at SMC we are in the process of removing the bentgrass from the back nine tees. The product used to remove bentgrass attacks the chlorophyll producing mechanisms of the plant causing it to turn white and eventually starve to death. Ultimately, to maintain a pure bluegrass/ fescue stand we need to produce healthy turf that will crowd out any undesirable weeds.

A Pasture Grass Plant Amongst a Pure Stand of Fescue
It is challenging to maintain pure fescue stands because of the fact we only mow these areas once per year and mowing itself is a method of weed control. The best way to maintain pure fescue is to burn these areas every year. Unfortunately, open field burning is banned in the Stowe, VT area. As a result of not being able to burn we apply herbicides that reduce the weed and pasture grass populations. Often times we will hand pull weeds if the populations are small.

Maintaining pure stands of desirable grasses is our goal. How we get there is multi faceted and often challenging. Once this goal is obtained the playability of the golf courses is improved and the enjoyment of the game is increased.

 

Stowe Country Club Update

General
The weather was once again the biggest challenge over the past month. The month of June brought over ten inches of rain to Stowe Country Club. In May, we battled the extreme lack of rain and now June was the complete opposite with record setting rain totals. This "new normal" of extreme weather patterns is reality and how we prepare to overcome these challenges is the difference between success and failure. The heavy rains were a good test for the new fairway and bunker drainage. These new drainage projects performed very good and we will continue to address other wet areas by installing more drainage.
Squeegeeing greens before Kirkwood Tournament

Kirkwood week was a challenge due to the rain. The days leading up to the event brought significant rainfall. The crew spent all day Wednesday before the tournament squeegeeing water off greens. Our sixth and final round of pushing water came as the sun went down. These efforts allowed for firmer greens for the first three days of the event. While Sunday ended in a rain-out, I am very proud of our crew's effort in preparing for the tournament.

Greens
The winterkill spots have grown in very well. The repair would have been much quicker if it was not for the excessive rain in June. These areas were damaged in the winter due to the fact that they puddle with water and then freeze. The nature of these areas to puddle made it difficult for the seed to establish because of being submerged under water and being constantly washed away. As the Kirkwood tournament approached the excessive squeegeeing damaged some of the seedlings setting the recovery back even farther. Mark Finch, golf course superintendent, did a superb job with the re-establishment of these areas. Mark worked diligently on a day to day and hour by hour basis for two months to get these damaged areas back to full turf coverage. Growing in turf on established golf greens is very difficult due to the ongoing maintenance of the surrounding turf and golfer traffic.
Root pruning at 15 tee

Tees
There were some recent changes to the fifteenth tee. The granite tee marker and bench were moved to make room for a root pruning operation. The close proximity of this tee box to the row of white pines negatively impacts the turf quality due to shade, needle shed, and root intrusion. The shallow rooting of white pines steals water and nutrients that is needed by the turf. Root pruning cuts the tree roots before they intrude into the teeing ground. We use the drainage trencher that was purchased last year to shear the roots. This process is an annual maintenance activity that will help the fifteenth tee recover faster from divoting and wear.


Fairways
The big push on fairways has been to achieve one hundred percent full turf coverage. The crew has been diligently seeding and sodding thin areas. Most of the damage is from poor drainage. Low areas on three, five, and twelve have had chronic thin areas. This is unacceptable for myself and staff. We will continue to sod and reseed until we reach full turf coverage in fairways.
Construction of cart path on 4th hole. Notice old path routing
to the left of new mounding.

Projects
The revitalization of the fourth hole is nearly complete. Multiple issues impacting the quality of this par three have been addressed. The over planting of trees on the left and right side of the hole blocked the view of the entire green complex and limited the use of the teeing ground due to blocked shots. A dozen trees were removed over the past two winters opening up the view of the green with surrounding mountain ridge line and providing full use of the tee. The fescue grasses that existed under the trees have come back to life and now provide a stunning framework to this hole. The cart path running along the right side was damaged in multiple sections, was too narrow for maintenance vehicles, and was positioned in a way that impacted the look of the hole. The path was repositioned and is now hidden from view. Slight mounding was added to aid in blocking the view of the cart path. Fescue was then planted along the new path to add additional screening of the path. As the fescue grass matures on both sides of the hole it will provide a stunning look to this great par three. The path is scheduled to be paved this week. Finally, the bunkers have been aggressively edged to bring back the original shape and add a better visual from the tee box. New sand was then added to provide consistent shot making.

The Spring Hustle


   As May has come to a close, it is a good time to review the condition of the golf courses and discuss the projects that have occurred. The variability of the Vermont spring is always a challenge for golf course maintenance. While planning operations is essential, it is even more important to be able to react quickly to unexpected challenges.

    The biggest challenge this spring has been the dry weather. While recent rains have helped, early spring rain did not occur. The successful start up and operation of  both irrigation systems has been of extreme importance. As the turf completes its winter dormancy and begins to grow, the need for water is crucial to initiate growth. While it might be hard to believe, early irrigation in May is crucial for positive turf growth. Turf is grown in sand based systems that can lose moisture quickly. In addition, the closely mown turf is very susceptible to moisture loss. Compounding the challenge of irrigating in a dry spring, a deep frost layer caused an above average number of breaks in the irrigation system piping. The turf care teams have been hustling to repair these breaks so that irrigation can continue.

9th green at Stowe Country Club. Notice standing water in the
damaged areas.
    Stowe Mountain Club (SMC) and Stowe Country Club (SCC) courses were impacted by winterkill this spring. The two reasons for winterkill this year were crown hydration and wind desiccation.  Stowe Mountain Club received desiccation damage on the first tee and sixth green. Those two areas were impacted due to the exposure to the severe north winds in the winter. In my eleven years at Stowe Mountain Club, I have never seen these levels of wind desiccation damage. The damage occurs due to the severe winds simply drying out the above ground tissue of the turf. Most often the turf can withstand the winter winds, this year the extended cold weather coupled with high winds pushed the turf to the extreme limit.

    This spring both courses were impacted by crown hydration. Ideal turf growing conditions during spring thaw requires sufficient surface drainage preventing standing water. Crown hydration occurs when night time temperatures drop below freezing. The cells in the turf plant will explode due to the freezing standing water. The common theme with this type of damage occurs in chronic wet areas. Stowe Country Club experienced crown hydration on the greens of one, nine, thirteen, and eighteen. At Stowe Mountain Club the damage occurred in the low lying areas of the fairways. The worst of the damage at SMC was found on eight and twelve. The turf care teams have seeded the damaged areas and positive germination has occurred. Full coverage is expected by the end of June. In reviewing the best options for damage prevention in the future, the installation of sub surface drainage to these wet areas will significantly reduce the potential for crown hydration.

    Currently, the Stowe Mountain Club crew is wrapping up a couple drainage projects that were initiated in the late Fall of 2014. The hillside on the eleventh hole had drainage installed to firm up the slope due to springs emerging through the turf. These springs were captured and piped through the fairway. The fourteenth fairway had drainage installed to help prevent winter damage and help firm up the fairway after rain events. These projects are in the final stages of completion.

    At Stowe Country Club a large key culvert was replaced in the practice field. The old pipe was made of metal and was rusted out creating multiple sinkholes holes in the field. Coupled with this project is the addition of target greens in the practice field. When completed there will be four greens for players to hit at. These greens will replace the current poles. The design of these target greens is such that they are raised slightly above the field and the top surface will be mowed at a short height. This raised angle and low cut will provide a larger target for players to aim at and improve their game. Two of the four greens have been shaped and seeded. the other two are still under construction. As an added visual aesthetic, there will be pseudo bunkers placed in front of these greens. These features will look like bunkers but will be built in such a manner that mowing and picking balls will not be extra maintenance.

Wash pad at Stowe Country Club. Notice grass clipping
separation system in trough.
    Finally, a project was completed at the SCC maintenance facility that has revolutionized how the turf care team  conducts business on a daily basis. A new equipment wash pad was constructed away from the fourteenth tee box. Prior to this new wash area, all equipment was washed directly adjacent to the tee box. The subsequent activity and smell of decaying grass clipping significantly impacted the golfing experience. The new location is on the other side of the road out of site of the public and golfers. The construction of the wash area is such that grass clippings can be managed properly reducing the odor and the water runoff is treated using a natural buffering system. Maintaining great golfing conditions starts with effective, efficient, and safe working conditions at the maintenance facility.

    While the dry May weather has presented some challenges for the grounds staff, the dry firm conditions have been excellent for golf. I hope everyone has had the opportunity to get out and play. Our two golf courses are very close to rebounding from winter and will soon be in top form. Thank you for your patience and assistance while we continue to maintain and improve the golfing experience at Stowe Mountain Resort.

A Work In Progress

    Golf courses are in a perpetual state of decline. It is no different from any other manmade object. A house, a car, or a road will eventually need some type of maintenance activity to keep it performing and looking good. Additionally, due to the fact that golf courses are a living and breathing (respiring actually) thing they can also be compared to human health. When neglected, the body and mind will decline at a faster rate than one that has had preventive health care and proper nutrition. Providing the golf course with proper nutrition, preventive treatments to ward off pests, removal of excess thatch, repair of failed infrastructure, and proper tree management ensures its long term health.
    While the term "a work in progress" often refers to a situation that needs work to become good, in the golf course world, it refers to the concept that the act of continual work is paramount to the future health and playability of the course. The simplest example of such work is aeration. The Mountain and Village course greens are two to three weeks out from a hollow core aeration. While the greens are a bit bumpy in the immediate days following aeration it is the long term health and performance of the greens that need focus. The removal of thatch and organic matter through hollow core aeration prevents soft greens that footprint easily and become bumpy, stay wet for extended periods, are more prone to disease, and become more susceptible to winter injury.
   The more complex work is the revitalization and repair of golf course features. Such work includes drainage repair and installation, repairing damaged cart paths, tee top leveling, re-contouring of bunker edges, and tree work. Some of this work occurred this Spring while other work will occur this Fall.

Stowe Mountain Club
  • Continued aeration. Fairway aeration is ongoing. We are currently half way through this process. With
    Fairway aeration and clean up
    good weather this process will be complete by next week. Tees and approaches will follow and only take a couple days to complete.
  • Drainage on the right side of eleven fairway. This hillside is crucial to the playability of this hole. Tee shots that hit the hill stand a good chance of rolling back to the fairway. Due to some groundwater springs, this hillside is often soft and impedes the ball from rolling to the fairway. 
  • Extend drainage in fourteen fairway. Last Fall, a main drain line was installed near the landing area. The main purpose of this line is to alleviate chronic winterkill caused by excessive wet turf during snow melt. The installation of this drain line was successful in limiting the amount of winterkill this Spring. This line will be extended and laterals will be installed to further eliminate the potential for winterkill.
  • Fairway drainage on fifteen fairway. As with fourteen, this fairway succumbs to winterkill due to wet conditions during snow melt. Drainage will be installed to assist with winter survival.
  • An ongoing project is the repair of a ground water spring above the first landing area on the eighth fairway. Due to the proximity to the dam, this project has been a slow and deliberate process. The design to alleviate this chronic wet spot has been highly engineered and managed. A subcontractor is currently being secured to finish the project. 
  • New forward tees have been built on the third hole and eighth hole. The third hole tee is now open. The eighth tee was constructed from the spoils of the previously discussed wet spot on eight. This tee has been seeded and will open Spring of 2015. 
  • Fescue has been planted along the stone collar on the ninth hole.

    Collar extension on #9
    This work also used the spoils from the drainage project on the eighth hole. Planting fescue along the edge of Peregrine Lake softens the look of the stone and allows for additional playability to mis-hit tee shots.  
  • The collar on the right side of the ninth hole has been extended. This collar extension was done to aid in the approach shot bouncing to the left and landing on the green. Collar extensions similar to this work have been installed on the sixth, eighth, eleventh, and thirteenth. These creeping bentgrass collar extensions are done to assist with better playability around the greens. 
Stowe Country Club
  • Tee aeration is complete. Fairways and approaches will be aerated after Stowe Mountain Club is complete. All of the aeration equipment is shared between both courses. Aeration at Stowe Country Club is very important because of the heavy clay soils that exist under all the features. Alleviating soil compaction and increasing surface drainage is part of the ongoing work that promotes healthy turf and good playability in all weather conditions.
  • A new culvert pipe was installed at the practice facility field. This pipe transfers water from a stream that enters the field on the west side. The existing pipe was an old metal pipe that had completely rusted and caved in. Prior to the installation of the new pipe being, water would flow onto the field and pool up for extended periods of time.
  • A new culvert pipe was installed on the thirteenth hole. This pipe had completely failed like the one on
    Silted bunker on #13
    the practice field. During the Winter melt, the pipe collapsed and silted in the greenside bunker. The pipe was replaced and the bunker was also repaired. New drainage was installed in the bunker along with all new sand being added. 
  • New forward tees have been constructed on the sixth and ninth holes. The ninth tee opened recently and the sixth tee may open in a few weeks if the weather provides good growing conditions. 
  • The final step in drying up the seventh hole was completed this Spring. The wetland to the left of the landing area was leaching water through the soil creating chronic wetness in the fairway. An interceptor drain was installed to divert this water away from the fairway. 
    Repaired #13 bunker with drainage
  • The new upper practice tee was opened during Kirkwood week. We doubled the size of the tee surface, moved the ball machine away from the road, eliminated a small practice green and bunker that had gone into disrepair, and provides a new staging area for carts during tournaments and outings.
  • This Fall, we plan on repairing multiple bunkers and fairways. These projects will commence immediately. The order of completion is as listed below.  
    • Multiple laterals will be installed on the eighteenth fairway. This work was started last Fall by installing a drainage mainline. We will connect multiple laterals to this mainline in the coming weeks.
    • The fairway bunker on the right of eighteen will be re-contoured and drainage will be installed. This bunker has grown in over the years and pools up after rain events.
    • A mulch bed will be installed underneath the spruce grove on the left of eighteenth hole. This work will be done to provide definition to the landing area and to protect the future health of these trees.
    • The greenside bunker on the first hole will be repaired. Currently, water leaches out of the bunker and settles near the approach. This area has turned into a chronic wet area that is very difficult to play out of. Additionally, the general appearance of this area is very poor and should be corrected because it sets the tone for the entire golf course. Internal drainage in the bunker will be installed to transfer the water away from the playing area and new sand will be added.
    • The second half of the ninth fairway will be drained and the greenside bunker will be repaired. This fairway does not drain after rain events. A main line will be installed with multiple laterals. The bunker will be re-contoured to divert surface drainage away from entering the bunker, internal drainage will be installed, and new sand will be added. 
    All of this work is being done with an eye on the future. The short term disruption to play is done for the long term goal of the continued enjoyment of both golf courses by the members and players. This continued enjoyment is based soundly on the hard work of the maintenance team and the commitment of Stowe Mountain Resort to provide great conditions.  We thank you for your patience and understanding while all of this work is in progress. 

 

November is Project Time

Starting the drainage on 18th approach by removing sod
While we strive to engage in productive projects throughout the year, there is an opportune window of time for larger projects between the date the course closes and the day winter truly arrives.

Once the door closes on the golfing season it is critical that we use this time to complete work that is otherwise too disruptive to conduct during the golfing months. In some regards, November is one of our most challenging months. On top of the essential tasks to carry out like covering the greens, draining the irrigation system, final snow mold prevention applications, etc... we also set some ambitious goals for course improvements. Numerous challenges are encountered at this time of year. Daylight, good working weather, and seasonal staff are all diminishing through October into November. Nevertheless, the shoulder seasons are when some of the most important work is done on course.

Excavation of drainage trench on 14 fairway
Drainage improvements typically take precedent on the late fall punch list. It has been discussed in prior blog posts that a well drained golf course is the foundation to a great golfing experience. Drainage improvements were made to the 3rd fairway, 4th approach, 18th approach and fairway, and on the 14th fairway. We were pleased to have completed the work on the 14th fairway as this area perennially sustains some winter damage. The intercepting drainage trench will help to reduce the large amount of snow melt flowing over the fairway. This snow melt causes ice and freeze/thaw cycles that are the major cause of winterkill.

Laying pavers at SCC "Hitting Barn"
In addition to these drainage projects, a forward tee has been added on the 3rd hole. It is located just before the bend in the cartpath as the fairway begins. It provides a clearer target view and fair access to the broad section of the fairway. The tee will be open for play soon after opening day. Lastly, a handful of staff on our Stowe Golf team made a major improvement to the Hitting Barn at Stowe Country Club. The first phase in revitalizing the Hitting Barn was resurfacing the dirt floor. We installed stone pavers and five artificial turf hitting mats. Interestingly, the pavers were reused from the renovation at the Spruce Peak entryway. This project was a collaborative effort between Stowe Mountain Club and Stowe Country Club employees. The hitting barn should be open for practice at the first sign of spring 2014.

July, Come and Gone...

The intention of this blog is to keep you informed of the comings and goings of the maintenance team and provide updates on the conditions at Stowe Mountain Club. While the blog was off to a good start, July simply flew by with no posts. My apologies. With that said, let's get back to business.

Wow, what a crazy weather season! The weather has been the top story around these parts. The golf course has received 29 inches of rain since May 1st. I need to thank the crew for powering through all these rainy days and getting things done around the golf course. The greens, tees, and bunkers have perfomed beautifully with all this precipitation. The main reason for this is because of good drainage. Greens, tees, and bunkers are built out of sand and have great subsurface drainage. As in the real estate industry where it is all about location, location, location. The golf turf industry is all about drainage, drainage, drainage. It is simply no fun to play golf on a soggy course mainly because the ground game disappears and your bump and run turns into a bump and slop.

The biggest challenge on the course due to the wet weather has been the fairways. Our fairways have good surface drainage due to the various catch basins located in the fairways. The challenge comes with the thick, rocky mountain soils that the fairways are planted on. These soils drain very slowly. With excessive rain the low areas in the fairways just don't dry out. Our actions are focused on identifying these wet areas and fixing them. The fix is to locate any springs that may be bleeding into the area and move that water out of the area through pipes. Or, if it is simply low and stays wet we will dig out the native soil and add pure sand. The later of these two scenario's usually occurs around catch basins where storm water is concentrated.    
Pipe back filled with stone and sand being placed around the catch basin

A good example of this process of drying out wet areas is the project that was recently completed on the 13th hole. Due to the exccesive rain, ground water springs that cause wet fairways in the Spring were problematic well into July. The left of the 13th green was a quagmire for 3 months due to a spring coming out of the hill. This was a call to action for the maintenance team because the area is a critical play area.The process involves removing the sod, piping the spring to the nearest catch basin, removing the native soil, placing sand around the catch basin, and replacing the sod. Due to this work, a tee shot that misses the green to the left can be putted back on the green off of a dry and firm surface. The process described above has been executed in over a dozen areas around the golf course over the years. It is a primary focus of the maintenance team to continue to fix these chronic wet fairway areas. As the weather patterns continue to prove to be extreme in their nature, these drainage improvements will play a critical role in making Stowe Mountain Club playable in all conditions.